ChangeLock™ — nothing changes without approval

Scope is versioned and locked. The only way to move it is a priced variation with cost, programme impact and evidence, approved by the client in three taps and written to the permanent record.

4x
Faster client sign-off
£14k
Typical value recovered per build
0
Verbal agreements

VO-004 · Bi-fold door upgrade

Sent
  1. Raised

  2. Priced

  3. Sent

  4. Approved

Priced breakdown

  • Supply — aluminium bi-fold£1,840
  • Labour — 1.5 days, 2 fitters£720
  • Structural opening adjust£320
  • Margin @ 18%£270
  • Client price£3,150

Impact

Contract sum
£184,000
Programme
no change yet
Evidence
3 items

Priced before it is promised

Labour, materials, plant, subcontract and margin build the number. The client sees one clear total.

  • Cost breakdown templates
  • Automatic margin application
  • Programme day impact
  • Supporting photos and quotes

Approved with a signature

The client approves in the portal. The signature, timestamp and IP are bound to the version they saw.

  • Three-tap approval
  • Version-bound sign-off
  • Deadline reminders
  • Decline with a recorded reason

Flows straight into the numbers

Approval instantly updates the contract sum, forecast, margin and programme — no re-keying.

  • Contract sum auto-updated
  • Forecast and margin recalculated
  • Programme dates shifted
  • Invoice line created
Builder pricing a variation on a tablet beside architectural drawings

3 taps

Client approval

100%

Change priced first

Locked

Version-bound sign-off

On the tools, not in a spreadsheet

Priced on site, approved from the kitchen table

A variation starts where the change happens — a photo, a note and a price from the tablet in the van. The client sees the same version, approves it, and the contract sum, forecast and programme update themselves.

Interactive walkthrough

Follow one variation, start to finish

Raise, price, approve, lock — step through a real bi-fold upgrade and watch the contract value move with it.

Follow one variation from a request on site to a signed change in the contract value.

Step 1 of 4

ChangeLock™ · Raise

The change is captured before the work starts

A client asks for wider bi-folds on site. The variation is raised in seconds with the request, the photo and the drawing reference attached — not scribbled on a dayworks sheet.

VO-004 · Bi-fold door upgrade

Raised

“Client would like the 3m bi-fold swapped for the 4m unit with slim frames.”

Requested on site
Drawing A-104 Rev C
2 photos

Locked to the project record the moment it is raised — no work proceeds until it is priced and approved.

See it on a real project

The demo workspace runs four live builds with full timelines, variations and health scoring.