Signature feature

Build Timeline™ — the build, replayed

Every event on the project writes to one chronological ledger: who did what, when, with what evidence, and what it cost. Scroll back six months and see exactly why a decision was made.

100%
Events captured automatically
0
Manual log keeping
Retention after handover

Brookfield Rear Extension · Build Timeline™

  • VO-004 raised — bi-fold upgrade

    30 Jul · £3,150 · +2 days

  • Site diary submitted

    29 Jul · 12 photos · 6 on site

  • Steelwork inspection passed

    28 Jul · Certificate filed

  • VO-003 approved by client

    24 Jul · +£2,400 · +1 day

  • Invoice INV-0007 paid

    21 Jul · £28,500

71

Watch

Project Health Score™

2 milestones forecast late · 1 client decision overdue

Programme · critical path

  • Strip out

    Groundworks

  • Foundations

    Groundworks

  • Steel & frame

    Structural

  • Roof & glazing

    Envelope

  • Second fix

    Internal

Everything lands here

Modules do not keep private histories. Each writes to the shared record the moment something happens.

  • Site diaries, photos and voice notes
  • Inspections and certificates
  • Variation and decision approvals
  • Document revisions with diffing

Evidence attached, always

Nothing enters the timeline without proof. Photos are timestamped and geo-stamped at capture.

  • Tamper-evident capture metadata
  • Before and after pairs for snags
  • Linked drawings at the revision used
  • Exportable evidence packs

Dispute-proof by design

The ledger is append-only. Corrections are new entries, never silent overwrites.

  • Append-only audit ledger
  • Full actor attribution
  • Filter by trade, phase or cost code
  • PDF export for contract admin
Residential extension under construction with scaffolding at dusk

Append-only

Audit ledger

Seconds

To find any document

Forever

Evidence retention

Every event, permanently recorded

The build you can replay, week by week

Every delivery, inspection, drawing revision, photo and approval lands on one chronological record. Two years after handover you can still show exactly what happened, when, and who signed it off.

Interactive walkthrough

Walk through a week on the Build Timeline

Four steps, real project data: capture on site, write to the ledger, see the programme impact, then replay it years later.

Watch a week of site activity become a permanent, evidence-linked record.

Step 1 of 4

Build Timeline™ · Capture on site

The site captures evidence, not paperwork

A trade opens the app, photographs the work and submits the diary in under a minute. Photos are timestamped and geo-stamped at the moment of capture, so nobody has to remember what happened.

Site diary · 29 Jul · Brookfield

Submitted

Steel padstones

Deck poured

Scaffold check

On site
6 operatives
Weather
Dry · 19°C
Captured
12 photos

See it on a real project

The demo workspace runs four live builds with full timelines, variations and health scoring.

Open the demo workspace